Suzhou City Xinlong Plastic Mould Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Wang Anling
  • Company Name : Suzhou City Xinlong Plastic Mould Co., Ltd.
  • Tel : 0086-512-66951150-616
  • Fax : 0086-512-66956631
  • Address : Jiangsu,Suzhou,Southern of Industrial Park,Guangfu Town,Suzhou City
  • Country/Region : China
  • Zip : 215159

moulding maker

moulding maker
Product Detailed
Related Categories:Moulds
moulding maker 1.Material:NAK80 2.Design Software:UG,CAD 3.Rich experienced skilled workers 4.ISO9001:2008

moulding maker 

1. Details of the product:

Name and function:

moulding maker 

Plastic material:

PP

Mould material:

NAK80

Mould base:

LKM

Mould life

300,000 shots

Mould finishing time:

35days

2. What Our factory does:

    3D drawing:

PRO/E. UG .3D. Autocad, etc

Quality and price:

High quality and a reasonable price .

     Service:

OEM & ODM & Buyer Label Offered.

On-time Delivery, ASSEMBLY SERVICE,One-stop service

Professional work:

Plastic injection mould ,tools making

Hot runner and cold runner mould

Custom plastic Injection moulding

Extrusion mould making

Plastic products

    

3.Some details of mould

     Manufacturer              

 Suzhou City Xinlong Plastic Mould Co,.Ltd          

     CAD&CAM

 PRO/E. UG .3D. Autocad, etc

     Mold steel

 P20.718.S136.H13.2738.NAK80.etc  

     Surface Treatment

 Polish.Etched.Texture.etc

     Moulding Material

 ABS.PP.PE.PC.AS.PMMA.PA66+GF.

     Mould Base

 LKM

     Mould lifetime

 300000shots available

     Runner 

 Hot or cold.According to the customer request.

     ODM&OEM

 Both available

4.Main equipment and department:

   Equipment List      

1.CNC                                                  quantity:6

2.Milling machine                                 quantity :4

3.Grinding machine                              quantity:6

4. Spark-erosion sinking machine        quantity:7

5.Wire machine                                    quantity:3

6.Driling machine                                  quantiti:3

7:Other:

Welding machine , Universal Grinding Machine ,

Big Grinding Machine , Small Grinding Machine ,

Screw Compressors

 Main department

Three workshops:

1.Plastic injection mould worshop :37 workers

2.Extrusion mould :43 workers

3.Plastic injection product workshop:30 workers

1. Plastic injection mould department :4 engineers

2:Extrusion mould department :6 engineers

4.QC department :4 Coordinate Measure Equipment

5.Trading department :3 salesman

6.Storehouse department :2 storeman

Main Market

Western European, North America, Japan & Russia

Payment

T/T

Packing  

For the plastic moulding :each in a wooden box with iron stand

For the plastic prodcuts:several in a plastic bags tissuse paper,then put the bags in a carton

Delivery:   By sea or By air

Remarks :

1.   Rich experience in the design and manufacturing of injection moulding. 

2.   High quality , competitive price , on_time delivery and excellent servive.

3.   Customers's 2D, 3 D drawing  or samples are welcomed.

4.   OEM & ODM orders are accepted

5.  Our company has passed  the ISO9001:2000 Certification.

6.  Three-eight-hour-shifts working system, ensure the efficient production.

FAQ:

1.What do you need for a quotation?

Our company is specialize in the injection moulding and,extrusion moulding and plastic injection products. You need to send 2D or 3D drawings or samples of your needed products to our company with detailed requirement of your product.Then we can quote the price and produce the mould match you requirement. 

2.For the runner ,what is available?

According to customer’s requirement .we can use the hot or cold runner.

3.What material are used for the mould?

We usually use the mould steel such as:S45C,S50C,P20,S136H,718,718H,2738,2316,2083,2311,NAK80,H13,etc.

4.What software is used in your company for mould design,product design,CNC programming?

For mould design ,we use UGS,Proe,AutoCAD,etc.

For CNC programming ,we use powermill.

5.How long it is for the lead time of the first mold test ?

Usually the lead time for the first mould test is 35days.The difference is based on the size and structure of the mould.

 

 

moulding maker



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.